Login:   Username    Password 
Line-X Protective Coatings About LINE-X Line-X Protective Coatings
Line-X Protective Coatings Testimonials Line-X Protective Coatings
Line-X Protective Coatings News Line-X Protective Coatings
Line-X Protective Coatings Promotions Line-X Protective Coatings
Line-X Protective Coatings Letters to LINE-X Line-X Protective Coatings
Line-X Protective Coatings Shop Line-X Protective Coatings
Get Protected by LINE-X Protective Coatings (Select An Option Below)
Locate a LINE-X Store
LINE-X Spray-On Truck Bedliners
The LINE-X Difference
Products
Lifetime Warranty
Request a Quote
Locate a LINE-X Store
Xperiments
LINE-X vs The Competition
How It's Sprayed
Become a Franchisee
Media
Contact Us
Testimonials
Interviews
Partners
Gallery
Light Industrial Coatings Heavy Industrial Coatings Paxcon Own a LINE-X Franchise

LINE-X® Case Studies - RV SHOWER & BATH FACILITY

LIGHT INDUSTRIAL CASE STUDY
RV SHOWER & BATH FACILITY

1

SITUATION
A popular RV campsite was building a shower and bathroom facility. They were in need of a flooring solution that would be sturdy enough to withstand constant foot traffic of the guests while remaining aesthetically appealing.

In addition, because of the showers and steam involved, it was imperative the solution be non-skid and water resistant.

 

2

PROCEDURE
The entire floor area was sanded, vacuumed and wiped down with a degreaser to remove contaminants.

LINE-X® XS-130 was sprayed to a minimum thickness of 3mm and given a textured finish. The entire floor of the shower and bathroom facility was completed in 6 hours.

3

SOLUTION
LINE-X XS-130 was chosen for its bonding ability to the substrate de-greaser to remove contaminants being used in the construction, as well as its non-skid and water resistant properties. Since XS-130 is aesthetically appealing and offers quick dry time all client needs were
fulfilled.

4

RESULTS

LINE-X provided an aesthetically appealing flooring solution that will withstand the foot traffic of the guests while providing the safety of a non-skid surface. Since the job was completed in one day, this allowed the construction team to resume work the following morning saving the client costly construction downtime.

      Terms of Use  |  Privacy  |  Sitemap