Login:   Username    Password 
Line-X Protective Coatings About LINE-X Line-X Protective Coatings
Line-X Protective Coatings Testimonials Line-X Protective Coatings
Line-X Protective Coatings News Line-X Protective Coatings
Line-X Protective Coatings Promotions Line-X Protective Coatings
Line-X Protective Coatings Letters to LINE-X Line-X Protective Coatings
Line-X Protective Coatings Shop Line-X Protective Coatings
Get Protected by LINE-X Protective Coatings (Select An Option Below)
Locate a LINE-X Store
LINE-X Spray-On Truck Bedliners
The LINE-X Difference
Products
Lifetime Warranty
Request a Quote
Locate a LINE-X Store
Xperiments
LINE-X vs The Competition
How It's Sprayed
Become a Franchisee
Media
Contact Us
Testimonials
Interviews
Partners
Gallery
Light Industrial Coatings Heavy Industrial Coatings Paxcon Own a LINE-X Franchise

LINE-X® Case Studies - SAND BLAST CABINET

LIGHT INDUSTRIAL CASE STUDY
SAND BLAST CABINET

1

SITUATION
The largest producer of reclaimed glassware in the world uses a sand blaster to frost their goblets and
tumblers. Due to the force of the sand blasting, the original door made of 5mm thick mild steel eroded forming a hole within approximately 12 weeks time costing the company replacement fees and production downtime.

The customer required a solution that would withstand powerful blasts on a continuous basis preventing downtime from its production schedule.

Vehicle owners looking for a solution to this noise problem are turning to LINE-X®.

2

PROCEDURE
A 1.5mm galvanized steel panel was used. The panel was shot blasted to increase the surface profile, primed and then sprayed 5mm thick with LINE-X® XS-100.

3

SOLUTION
LINE-X XS-100 was chosen due to its high impact absorption properties and sprayed on a 1.5mm galvanized
steel panel to replace the original steel door.

4

RESULTS

The panel was subject to high pressure sand blasting for a period of 6 months, after which it was returned to LINE-X for evaluation. The results were outstanding. In the 6 month period, only 2.5mm of the LINE-X had been worn away under the harshest conditions.

Compared to the steel panel, the 5mm thick LINE-X panel is expected to last 12 months. In this timeframe, previously the client would have had to replace 9 of the 5mm thick mild steel doors.

“The application of LINE-X to the sand blaster door has resulted in over 50% less downtime of the machine and considerable savings in the cost of replacement doors.” –
Managing Director